RB iconIP iconMPE iconRBAS iconRouse icon

Metalika C-1200 Concrete pipe making machine

부가세 제외가격

POA

Favorite즐겨찾기
share공유
Save search검색 저장
출력

INFO

제품군
콘크리트 스톤 머신
제작사/모델
Metalika C-1200 Concrete pipe making machine
제작년도
2020
컨디션
새제품
장비위치
Sopot (Srbija)
국가
세르비아
일반 등급
1
2
3
4
5
마스쿠스 ID
778AEBF6

세부정보

엔진
Elektro
상태 정보/보증
12 meseci
제품 국가
세르비아
운송 조건
FCA, CPT, CIP, DAT, DAP, DDP, FAS, FOB, CFR, CIF, EXW
증명서
미국 환경 보호국(EPA), 유럽 위원회(CE), 미국 규격 협회(ANSI), AS, CSA, EAC GOST, TRUA, JIS
부속품
제어 시스템
제어실
콘크리트 보관
기타 정보
Concrete Pipe Machine C-1200 (Machine for producing concrete pipes). Machine for producing concrete pipes C-1200 produces concrete pipes diameter from 300-1200mm by vibrating of core. Machine is placed in concrete base built according to manufacturer’s layout. Forming head, electric and hydraulic controls are placed above surface. Main parts of C-1200: - Main hydraulic cylinder stand - Hydraulic cylinder with core bearer - Core with vibrators Bfkxkxxqdc - Chassis with steel plate Technical data of Concrete Pipe making machine C-1200: - Pipe diameter: fi200 - fi1200 - Pipe height max: 1m - Installed power: 18 kW / 380 V - Simultaneously max: 11 KW Capacity for producing concrete pipes height 1m: 1. 150 pipes - fi300 per 8h 2. 150 pipes - fi400 per 8h 3. 120 pipes - fi500 per 8h 4. 90 pipes - fi600 per 8h 5. 50 pipes - fi1000 per 8h 6. 40 pipes - fi1200 per 8h - Concrete base dimensions: 4100x3470x2150 - Forming head height 1500 mm. - Total weight without ring pads: 6135 kg (with outside moulds and core fi300/400/600) Number of workers needed: •Concrete transport from concrete plant to machine C-1200: 1 •Operator C-1200 : 1 •Fresh pipes transport from machine to curing place with accu cart: 1 or •Fresh pipes transport from machine to curing place with standard cart for fi300-fi 700mm: 1 or •Fresh pipes transport from machine to curing place with standard cart for fi800-fi 1200mm: 3 •Worker for placing ring pad in machine: 1 Space required for machine C-1200……………………… 70m2 Storage place for ring pads and moulds......………………..10m2 Space required for daily production of pipe fi 1000mm: •45 pipes fi 1000: 60m2 •Pipes need to cure 48h before removing ring pad: 120m2 •Pipes need to cure for 10 days before transport (storage of products): 400m2 Total space required for production of pipes: 660m2 + 100m2 for transport paths = 760m2 *It is good to have all this space indoor, but necessary indoor space is only for machine (70m2), rest can be done on the outdoor. Mechanisation: Forklift 5t, with silo, for concrete transport (from concrete plant to machine C-1200) For more extra optional equipment and detail offer, send inquiry or call me on my mobile number.더 보기

METALIKA SMTR

Milosava Vlajića 116e 11450 Sopot Beograd, Srbija 세르비아
report ad의심스러운 광고 보고