코마츠 PC 400-7
부가세 제외가격
출력
INFO
제품군
대형 굴삭기 29톤 이상
제작사/모델
코마츠 PC 400-7
제작년도
2016
사용시간
3850 시간
컨디션
데모
국가
중국
일반 등급
1
2
3
4
5
마스쿠스 ID
1BE90A0B
가격
화폐 선택
세부정보
동력 형식
액상 가스
엔진
SAA6D125E - 3
총 중량
41400 kg
엔진 출력
246 kW (334 마력)
엔진 제조사
KOMATSU
매연 등급
Stage IV / Tier IV final
버켓 용량
1.90 m3
트랙 폭
600 mm
최고 속도
5.50 km/h
장비크기
11940 x 3340 x 3660 mm
오리지널 컬러
Original
제품 국가
일본
운송 조건
FOB, CFR, CIF, EXW
부속품
GPS
냉/난방 조절
스켈레톤 버킷
배터리 분리기
조이스틱 컨트롤
표준 굴착 버켓
기타 정보
The Komatsu PC400-7 is a 40-ton heavy-duty tracked backhoe excavator. With its powerful engine and stable operating performance, it is widely adaptable to various large-scale heavy engineering projects.
Applicable Scenarios:
Mining Operations: As one of the core application scenarios for this model, its 275kN bucket digging force easily handles the excavation and stripping of hard materials such as ore and hard rock. Meanwhile, its 41.4-ton overall weight and stable tracked walking design maintain operational stability on uneven mine terrain, making it suitable for daily mining and slag removal work in open-pit coal mines, iron mines, and other open-pit mines.
Large-Scale Earthmoving Projects: It offers significant advantages in large-scale earthmoving operations such as urban new area development and industrial park site leveling. With a 1.9m³ bucket capacity and high-efficiency operation, it can quickly complete large-scale earthwork excavation and transportation. Its maximum digging radius of 12025mm and maximum digging depth of 7820mm also meet the needs of deep earthwork excavation, significantly improving the efficiency of site leveling and foundation excavation.
Road and Infrastructure Construction: Suitable for roadbed engineering of large-scale transportation infrastructure such as highways and railways, it can efficiently carry out roadbed excavation, filling, and slope trimming operations. Its 70% climbing ability can handle slope scenarios in roadbed construction, while its strong traction ensures stable movement on soft ground in unfinished roadbeds. It can also be used for bridge foundation pit excavation, matching the construction intensity of large-scale infrastructure projects.
Water Conservancy Projects: Suitable for river dredging, reservoir dredging, and dam construction. Its tracked design allows it to operate in muddy terrain near water, and its large digging depth can handle silt and rocks at the bottom of the river. Its powerful boom digging force (214kN) can help with earthwork compaction and slope trimming during dam construction, ensuring the quality and progress of water conservancy projects.
SHANGHAI DIGE ENGINEERING MACHINERY CO.LTD
闵行区景东路3539A 200000 上海 Shanghai 上海 중국